VyváženíBALANCING #4
Změny: 3 a Úpravy: 1.

Díky našim mecenášům@Gunter
Úprava. Reduced the breakage % of extraction items
52.5%-50%Změněno. Now when working at construction sites you get 3xp and no longer 5xp
Změněno. Now each work shift at construction sites lasts 60min and no longer 30min
Změněno. Increased the duration of each work shift at all extraction points